<div class="pre">Procurement of Combined Marine- and Construction Allrisk Insurance for the Offshore Grid Connection System Ostwind 4 located in the German Baltic Sea (Primary Policy).</div>
<div class="h1">Beschreibung</div>
<div class="pre">The Grid Connection system is consisting of - 525kV 2 GW DC cable systemswith a total length of approx. 110 km offshore and 5 km onshore - Offshore Converter Platform incl. auxiliary equipment - Onshore Converter Station incl. auxiliary equipment Insured Interest: ‘All Risks’ of physical loss or physical damage in respect of the “Ostwind 4” Offshore Grid Connection System Project plus removal of Wreck, Debris and Sue & Labour and other coverage as per wording. Insurance policy wording will grant seamless transition from Marine- to Construction Allrisk Insurance. Inception of insurance cover will be with start of assembly of Offshore Converter Topside in the Shipyard estimatedon 29th of May 2026. The insurance period will end with final taking-over of the whole project estimated in May 2026, followed by 24 months of Extended Maintenance. Keyfacts of tendered Coverage: Combined Marine and Construction Allrisk Insurance for HV/DC Grid Connection System Ostwind 4 (Primary Policy) Single Loss Limit: 400,000,000 EUR Deductibles: Transportation onshore/offshore: 2,500,000 EUR (optional 250,000 EUR) each and every occurrence Onshore works: 200,000 EUR each and every occurrence All other: 5,000,000 EUR (optional 1,500,000 EUR) each and every occurrence</div>
<div class="h1">Interne Kennung</div>
<div class="pre">Los 1</div>
Zusammenfassung:
Tätigkeiten:
Details:
- Auftraggeber
- AusfĂĽhrungsfristen
- Vergabeunterlagen
- Bekanntmachungstext
- Und vieles mehr …
oder:
Id: JzIdDXP5nD