Ausschreibung
Probe-station for 2.5D/3D memory device testing (IPMS-CNT01.1) - PR1035458-2480-P
AusfĂĽhrung:
Sachsen
Frist:
27.02.2026 10:00 Uhr
Leistungsbeschreibung:
<div class="h1">Titel</div>
<div class="pre">Probe-station for 2.5D/3D memory device testing (IPMS-CNT01.1) - PR1035458-2480-P</div>
<div class="h1">Beschreibung</div>
<div class="pre">1 Stück - Probe-station for 2.5D/3D memory device testing Optionen: LV Pos. 12 System configuration - active chuch cooling LV Pos. 13 System configuration - low temparature measurements LV Pos. 23 System configuration - temporary electric discharge of the chuck LV Pos. 31 System configuration - fixture for 6" std. rectangular cantilever probecard LV Pos. 35 System configuration - number of manual positioners included in quote: magnetic mount; 3-axis xyz moveable LV Pos. 36 System configuration - number of probeholders and probearms included: fit to above manual positioners; including fixtures to be installed with above positioners; including electrical shielded connection (BNC/Triax) LV Pos. 37 System configuration - number of single probes included in quote: fit to above probe holders LV Pos. 39 System configuration - Magnetic field option available LV Pos. 40 System configuration - MOKE option available LV Pos. 70 measurement equipment - one-time calibration of all measuring devices LV Pos. 73 IT, Software, Hardware - internal HDD preferably SSD LV Pos. 76 IT, Software, Hardware - NI LabVIEW drivers are available LV Pos. 83 IT, Software, Hardware - maintenance software bundle (sensor/actuator checks, calibration, compensation, log file management) LV Pos. 90 IT, Software, Hardware - If the FhG IPMS CNT already owns a comparable system, this system can be upgraded to the latest software version, too LV Pos. 93 safety - A confirmation of the electrical safety of the system (according to DGUV V3) is supplied LV Pos. 94 safety - In addition, in accordance with the principles of the Machinery Directive 2006/42/EC, the following documents should be included in the scope of delivery: technical documentation; risk assessment and safety documentation LV Pos. 112 warrenty -extended warranty period 1 yr additional to the period specified in the commercial terms</div>
<div class="h1">Interne Kennung</div>
<div class="pre">LOT-0000</div>
Zusammenfassung:
Tätigkeiten:
Details:
- Auftraggeber
- AusfĂĽhrungsfristen
- Vergabeunterlagen
- Bekanntmachungstext
- Und vieles mehr …
oder:
Id: ZMEaxTvbBI